How to clear subcontractors for site

A document checklist walkthrough so “cleared for site” means the same thing to PMs, coordinators, and supers — without overclaiming legal approval.

Key takeaways

  • Define cleared as checklist-current for site rules — not globally risk-free.
  • Run clearance against the vendor record plus project-specific adds.
  • Time-box exceptions with owners.
  • Communicate with a status link, not PDF showers.
  • Re-check expirations that fall during the mobilization window.

Define “cleared” in writing

Write one paragraph: which documents must be current-per-checklist, who may grant exceptions, and whether site orientation or other non-document steps are in or out of scope for the compliance coordinator. Ambiguity here creates Monday morning arguments at the gate.

Walkthrough

Open the sub record. Confirm category. Review day-one docs. Open COIs and record dates. Check license lines if applicable. Note missing endorsement packets. Set status. Notify the PM. If an exception is needed, capture reason, approver, and end date before the sub arrives.

  1. 1

    Pull the sub + project

    Correct legal name; avoid duplicates.

  2. 2

    Run the site checklist

    Day-one + project adds.

  3. 3

    File or chase gaps

    Explicit requests only.

  4. 4

    Set status + notify

    Shared language.

  5. 5

    Calendar mid-job expirations

    Do not clear and forget.

PM vs compliance coordinator

Coordinators own intake quality and queues. PMs own schedule pressure and exception requests per policy. Neither should silently redefine “cleared.” Meet once when introducing the definition; reinforce in look-ahead meetings.

Mobilization Monday prevention

Clearance should finish before the weekend whenever possible. Maintain a Wednesday filter for next-week mobilizations. Heroic Sunday night emailing is a process smell.

Tools

Checklist templates plus a shared tracker unlock the habit. VendorSorted makes the vendor status the meeting artifact. Portal features remain planned until shipped.

Common pitfalls

Most failures are process failures — not missing jargon. Watch for these patterns early.

  • Verbal clearance only

    No audit trail.

  • Clearing on promise of a COI tomorrow

    Unless your exception policy allows it — with an owner.

  • Different checklists per PM

    Subs get whiplash; risk uneven.

  • Ignoring mid-project expirations

    Cleared at start; lapsed at week six.

  • Equating site orientation with insurance checklist

    Different systems; both may matter.

Frequently asked questions

Is this guide legal or insurance advice about clearing subcontractors for site?

No. It is operational education for teams that collect and track vendor documents. Requirements vary by contract and jurisdiction. Confirm with counsel and your broker.

Does a certificate of insurance prove coverage is adequate?

No. A COI is a summary snapshot. Adequacy depends on the underlying policy, endorsements, and your contract requirements. Treat certificate review as intake and date capture — not final coverage verification.

Will uploading documents in VendorSorted email my vendors?

No. Uploads and imports never email vendors. Outreach happens only when you explicitly send a request or later enable an approved automation policy.

Are the document lists here mandatory for every company?

No. Lists are starting frameworks. Your organization decides what to require, and VendorSorted treats document types as configurable — not hardcoded trades or forms.

How often should we re-review this process?

Many teams review expiration queues weekly and audit a sample of vendor files quarterly. Choose a cadence you can sustain; the guide is not prescribing a legal schedule.